Eagle House, Hastings

Hastings Commons has continued its work to bring vacant buildings in Hastings back into use and create much-needed community facilities. Building on our successful collaboration with Hastings Commons and IF_DO Architects on the Observer Building, we provided MEP engineering services for Eagle House, the restoration of a Victorian building on Cambridge Road that now serves the local community.

People chatting by a reception desk in a shared workspace.

Key information

Architect

IF DO Architects

Client

Hastings Commons Neighbourhood Ventures

Value

£2.4M

Year of Completion

2026

Location

Hastings

Sector

Services

Restoring for long-term community ownership

Built in 1867, Eagle House had been in decline for years, and alterations had eroded much of the five-storey Victorian building’s original character, removing historic features and large windows, leaving it dark, inefficient, inaccessible, and in very poor condition. Hastings Commons acquired the building as part of its mission to restore properties for long-term community ownership and create welcoming spaces that support local people and organisations.

Working closely with residents, volunteers and young people, the design team developed a brief that reflected the local community as well as a loose-fit approach, allowing for future adaptability. The completed building now provides a free common room, counselling spaces, affordable workspace and youth facilities, creating opportunities for social connection, learning and enterprise. 

Retaining the existing building

Retaining and improving the existing building was central to the project's environmental aspirations. By avoiding demolition and extending the structure's life, the project saved significant amounts of embodied carbon. Any inappropriate alterations were reversed, window proportions were restored, and materials were reused where possible, such as timber boards in the pitched roof lining.

We calculated that heating would account for a significant portion of the building's energy demand and tackled this with a fabric-first approach: external walls and roofs were insulated well beyond the minimum required to meet building regulations, with triple glazing installed in all new windows. Efficient fabric reduced the heating load, allowing us to make use of the limited roof space for a cascaded domestic heat-pump installation to provide space heating. This, coupled with the underfloor heating system, means the building benefits from zero fossil fuels on site, low heating energy demand and high heat pump efficiencies. 

Eagle House is naturally ventilated wherever possible. In addition to being low-cost, this keeps the maintenance strategy simple for the client and gives users control over their environment. The building form is well-suited to cross-ventilation, allowing even the more densely occupied office spaces to passively remain cool on hot days. 

The project meets RIBA 2030 targets for embodied carbon, and operational carbon is reduced by 60%.

2026 Architects' Journal - AJ Retrofit Award Retrofit of the Year - Winner
2026 Architects' Journal - AJ Retrofit Award Adaptive reuse into mixed use - Winner