Future thinking - innovation in practice

Exterior shot of Homerton College Dining Hall on sunny day.

This year, we're celebrating the 60th birthday of our practice, which Max founded in his Camden home back in 1966. We've been busy capturing our projects, culture and our people's most insightful thoughts.

We asked a handful of our next generation of engineers and consultants about their most innovative projects. What are they learning, why are they important and how are they innovative? Here's what they had to say...

A headshot of Bianca Wilcox wearing a  a blue jumper over a blue shirt

Bianca Wilcox

50-60 Charter Street at Wood Wharf with GRID Architects.

“One of my most challenging yet rewarding projects to date, 50-60 Charter Street, combined the complexities of high-rise building engineering with an ambitious approach to repeatable, off-site construction.“

"Working on a development of this scale required engineering solutions tailored to the demands of tall-building design, from phased pumping strategies to complex drainage systems and extensive life safety systems. With 756 apartments distributed across two towers of 34 and 49 stories, repeatability was a central design principle amongst the team, driving extensive prefabrication of utility cupboards, bathroom pods, plant skids, and, ultimately, complete corridor sections to improve quality, efficiency, and buildability during construction

As a Digital Design specialist at Max Fordham, one of the most rewarding aspects of the project was successfully securing buy-in from the client and architect to celebrate elements of the building services design rather than conceal them. In select key communal spaces, exposed services became part of the architectural language - showcasing the technical design, coordination and design team collaboration that often remains hidden behind a ceiling."

50-60 Charter Street, Wood Wharf

A headshot of Brooke Smith wearing a yellow blouse

Brooke Smith

Homerton College Dining Hall with Fielden Fowles. 

“It was quite instructive for me regarding material choices." 

“It was early in my embodied carbon modelling days, and I was surprised by what contributed most to the project's embodied carbon. Usually, you expect a very traditional material, such as terracotta tiles, that have been used for centuries, to be some of the lowest embodied carbon materials that make up a building. However, because of the firing process, they accounted for a larger share of the upfront carbon in what was otherwise a predominantly timber building. It really hammered home the fact that embodied carbon is not just about where a material comes from but also how it is processed.“

Homerton College Dining Hall

A headshot of Jake Kay wearing an olive green shirt

Jake Kay

Middlesbrough Old Town Hall with Group Ginger Architects.  

“It is the first project that I've led through from concept all the way through to construction at Max Fordham, so a lot of project running lessons have been learnt!”

“Middlesbrough Old Town Hall, is a Grade II listed building in Middlehaven. Over the years, it has contributed to the social, political, and cultural life of the community. Despite multiple renovations and partial demolitions, it has fallen into disrepair and has been uninhabited since. Its renovation will transform it into high-quality office space for the rapidly expanding digital and creative sector in Middlesbrough, supporting economic growth and attracting inward investment - it's the flagship project as part of a wider regeneration of a huge area of Middlesbrough.

The architect was on board with the passive design principles that we put forward such as introducing openable roof vents for natural ventilation, including external brise soleil on the south-facing, new-build windows to minimise unwanted solar gain, introducing secondary glazing to historic windows and including high-performance glazing in new build areas. We worked really hard to remove the need for active cooling - which we also verified through extensive thermal modelling. This ensures we're handing to the client not only an energy efficient, low carbon building, but a building with running costs minimised.“

Middlesbrough Old Town Hall

Studio portrait of a woman with curly shoulder-length hair wearing a green blouse and necklace, photographed against a black background.

Nadya Lokhmotova

The Entopia Building with Architype and Fielden & Mawson.

“On Entopia, we co-developed an innovative airtightness and moisture management strategy for this deep retrofit project.“

“I don't think anything quite like this has been successfully implemented at this scale before, and it's proven to work, with airtightness results coming close to the Passivhaus new-build limit. 

The value of this innovation goes beyond the energy and carbon savings, impressive though those are. What's particularly important is the precedent it has set for the industry, showing what is possible on a retrofit project.“

The Entopia Building

A headshot of Conor Haselden wearing a dark grey shirt over a white t-shirt

Conor Haselden

Willohaus with Buttress Architects. 

”Willohaus has taught me that innovation can come from simplicity rather than complexity.”

“A combination of careful detailing developed by Buttress and us, and excellent attention to detail from Eric Wright Construction, has led to the best-ever airtightness result for a large apartment building in the UK. This will deliver low energy bills and high comfort for residents by prioritising design and construction quality in ways that do not add cost or complication to the project.“

Willohaus

A headshot of Jack Hayhurst wearing a green and white checkered shirt

Jack Hayhurst

All Souls College, Oxford with Wright & Wright Architects.

”I learned a lot about implementing innovation and sustainability at All Souls College, Oxford. The client is ambitious and has really high sustainability aspirations.”

“We're aiming to achieve EnerPHit-level airtightness, targeting a rate of 1.0 ACH by improving insulation, utilising Diathonite and wood-fibre board for insulation. We’ve done detailed WUFI hygrothermal modelling to measure thermal performance while managing moisture risk within the existing building fabric. The replacement of existing windows with triple-glazed, highly airtight units also improves thermal performance, reduces draughts and supports the overall airtightness and energy strategy for the building.  

We’re also actively exploring the use of reclaimed steel to reduce embodied carbon impact, which requires collaboration across the supply chain and commitment to circular economy principles. We’ve already highlighted existing steel for reuse in temporary works.“

All Souls College, High Street, Oxford

A headshot of Mark Gorin wearing glasses and a white shirt

Mark Gorin

Irishtown Leisure Centre with FaulknerBrowns Architects. 

”Having worked as an architect for many years before becoming a Passivhaus Consultant at Max Fordham, I have had my share of challenging experiences with MEP engineers across various projects, but working with our internal MEP team here has really been a breath of fresh air, with the knowledge and experience flowing both ways.”

“This is a really interesting leisure centre project, with two swimming pools, a gym, fitness studios and outdoor sports facilities. As part of the Passivhaus team, I'm providing guidance on the principles of Passivhaus design to minimise operational energy use and ensure user comfort.  

As a leisure centre project, it involves complex use profiles and energy requirements, but one highlight has been working with the Max Fordham Edinburgh MEP team. They bring extensive leisure centre and low carbon experience to the project, providing the mechanical, electrical and plumbing design services.“

Irishtown Leisure Centre

A headshot of David Montgomery wearing a white shirt

David Montgomery

Cambridge Guildhall with Cartwright Pickard Architects.

“An obvious project for me is the Grade II-listed Cambridge Guildhall. It’s an existing listed building, with lots of heritage constraints particularly regarding the external facade and key civic function rooms."

“It’s aiming to be highly sustainable and reuse as much as possible; it’s a UK NZCBS pilot project and is now pursuing formal verification. The retrofitted building is expected to consume 65% less energy, will be fossil fuel-free, and utilise air-source heat pumps.  We’re working to achieve water neutrality, so exemplary water consumption performance levels are specified for sanitaryware and we’re incorporating a rainwater harvesting system. Heritage items such as fixtures and fittings will be retained and we’re looking at relocating and reusing the building's existing photovoltaic panels.“

Cambridge Guildhall