The Draft London Plan 2026 is the Mayor of London’s proposed replacement for the current London Plan 2021. It is the emerging strategic planning framework intended to guide how London grows and develops over the coming decades. The draft plan was published in July 2026 with invited consultation up to October.
The draft plan broadly addresses the concept of Good Growth, defined as growth that drives economic productivity while being socially inclusive and environmentally sustainable, across four main categories:
We work regularly on housing delivery, reducing carbon, and improving energy efficiency, and felt that some areas of the plan could use additional consideration. See our responses to the specific plan sections below:
Relating to the section Delivering homes and neighbourhoods (HN), we oppose the proposals to reduce requirements associated with ceiling heights, natural light and passive ventilation for kitchens as well as the relaxation of restrictions on single-aspect dwellings. These changes could increase overheating and energy use while reducing residents’ comfort and wellbeing.
Our response to section HN8: housing design
Relating to the section Growing London’s economy (GLE), the Circular Economy Statement should actively promote retrofit, retention and reuse. Substantial demolition should be subject to a clear Retrofit First test. Reuse and recycled content should be assessed separately to reflect their distinct circularity benefits. The policy should distinguish between different forms of retention, reuse and recycling. Strategic waste targets should also incorporate a broader circularity metric.
Our response to section GLE 11: circular economy
Relating to the section Creating a greener, healthier and more resilient city (GHR), we broadly support the proposed approach to energy efficiency and low-carbon heat, including the move to energy use intensity (EUI) and space heating demand (SHD) standards, renewable energy provision and post-construction monitoring. However, EUI and SHD requirements need a consistent methodology, realistic baselines and greater clarity around regulated and unregulated energy, whole-building assessment and occupancy. We would also proposed allowing Passivhaus certification as an alternative route to compliance.
Although we support the direction of the whole life carbon policy, particularly the shift from reporting towards reducing embodied carbon, we believe it should apply to all major developments and that the proposed upfront carbon limits require a more robust evidence base. Whole life carbon assessment should influence early design decisions, prioritising retention, lean design and material efficiency, with a Retrofit First test for substantial demolition and clearer alignment with RICS WLCA 2nd Edition and the UK Net Zero Carbon Buildings Standard. Carbon commitments should then carry through design, procurement and construction, with monitoring and as-built verification rather than relying on planning-stage reporting alone.
We believe stronger action on heat risk is required, including passive design, reduced glazing and external shading, and recommend dynamic modelling against current and future climate scenarios to demonstrate performance.
Our response section GHR1: energy efficiency
Our response to section GHR2: low-cost low-carbon heat
Our response to section GHR3: whole life-cycle carbon
We do not support this policy although the direction and evidence base are strongly supported.
GHR3 requirements which apply only to referable applications allow many major developments to be undertaken without consideration of embodied carbon. Requirements should be applied to major development, as well as referable ones.
We welcome the move from simply reporting embodied carbon towards requiring reductions. The submitted LPNZ Evidence-Embodied carbon concludes that reporting and benchmarking alone are insufficient and identifies lean design, material efficiency and upfront carbon requirements as mechanisms for achieving reductions.
We do not consider the policy fully justified or effective in its current form. The targets need to be demonstrably achievable across the building typologies to which they apply and linked to a process that influences design decisions rather than simply reporting performance.
The evidence base for the Upfront Carbon limits appears flawed. Judging from Hawkins Browns graphs, MEP is estimated as ~70-80 kgCO2e/m2, so around 80-92 kgCO2e/m2 when including a 15% WLCA uncertainty factor. MEP is very difficult to model accurately at early stages, however, our models suggest an average more akin to 110-140kgCO2e/m2 (incl 15% contingency). This has been backed up by other peers in our industry with in-house MEP expertise. When attempting to mitigate the Upfront impact of MEP, you have to be extremely careful not to just 'shift' the carbon into B1 or B6. We've been doing optioneering focused on reducing Whole-life impacts of HVAC strategies for a number of years now, and the Upfront result has never dropped below 100 kgCO2e/m2 GIA - and these tend to have unique features not replicable on every project. Our concern is that this appears to be a dramatic underestimate of MEP upfront carbon and will simply 'punish' any project that employs a WLC assessor with better access to detailed quantity information of building services systems. Or in simple terms, it will punish projects that employ more realistic WLC assessors.
WLC assessment cannot turn into a race-to-the-bottom where the poorer models are rewarded with less planning push-back. In addition to the above, the evidence base relies dramatically on cement replacements. The only mainstream replacement available is GGBS, whose use in higher-than-averagely-available proportions for carbon reductions has been thoroughly debunked by the building industry, see IStructE The efficient use of GGBS in reducing global emissions. While other replacements are available - and the hope is Calcined Clays gain market uptake - presenting an evidence base that reaches intermediate and aspirational targets through over-specifying an extremely scarce resource does not represent an acceptably robust, or valid, conclusion.
Our takeaway is that the upfront targets are set quite low with flawed evidence in the background. Better quality models will almost certainly exceed the limits for 'reasonably good buildings', and most projects are going to be indirectly forced into over-specifying cement replacements that we know have no net-benefit to the climate issue at hand.
The targets should also be explicitly calibrated to RICS WLCA 2nd Edition. The evidence base acknowledges that reported emissions have changed partly because of developing calculation methodologies and recommends moving from RICS WLCA 1st Edition to 2nd Edition.
Greater clarity is also needed on the relationship with the UK Net Zero Carbon Buildings Standard (UKNZCBS). The evidence base identifies its Performance Level 3 as aligned with UKNZCBS for upfront carbon, while noting that UKNZCBS does not set whole-life carbon limits.
Most importantly, WLC assessment (in particular upfront carbon) should influence decisions while change is still possible. The evidence base itself states that embodied carbon should not simply be reported and that clients and design teams should work together to reduce upfront and lifecycle carbon from early design stages.
Requirements for referable application to ‘assess the potential for retaining existing buildings’ do not go far enough in preventing unnecessary demolition of buildings which could be reused. The London Plan should undertake a sequential test to establish justification for demolition, including analysis of structural soundness, requirements of use, whole life carbon and public benefit, similar to the process set out in Westminster Retrofit First policy.
Westminster Council’s Retrofit First Policy Guidance for Environment SPD provides a useful precedent: it sequentially considers structural feasibility, requirements of use and carbon options and requires deliverable development options to be compared.
We recommend that GHR3 establish a clear process for policy implementation from basebuild, optioneering, tangible planning commitments, monitoring and as-built verification
WLC optioneering should occur while major decisions remain open, particularly those relating to retention/demolition, structural strategy, façade, material efficiency and building services.
Lean design and material efficiency should be given greater policy weight. The evidence base specifically identifies these as means of reducing embodied carbon through existing building retention, good design and material efficiency.
Where targets are not achieved, applicants should demonstrate why and identify the measures undertaken to minimise the result. This would provide a more meaningful assessment of performance than simply recording whether a target has been achieved.
Planning-stage carbon commitments should then be translated into detailed design, specifications/Employer's Requirements and procurement requirements, with actual performance verified at completion. Introduce pre-construction submission to make the applicants' carbon commitments serious.